We were approached by NC & JC Construction with a view to pricing a large attenuation tank (960m3) for a job in Aston Clinton, Aylesbury.
Client: | NC & JC Construction |
Location: | Aston Clinton HP22 |
Job Type: | Commercial |
Application: | Attenuation |
System: | PSM1a & PSM4 Inspect |
Date: | December 2018 |
We secured the order and then worked closely with the site team to make sure this tank was installed within a very tight deadline.
The customer had traditionally installed these types of tank themsleves, but the designers needed the peace of mind of a fully welded geomembrane.
This calls for a specialist team & they now know any future attenuation tanks they require & the Geomembrane needs fully welding they can come to us & rest assured this will be completed safely & in a timely manor.