Carrying out projects in the high-risk rail industry requires an exceptional level of expertise and the ability to work swiftly and safely. So when specialist electrical company RJ Power asked for our help on a project at Generals Lane, Chelmsford, we were happy to step in.
Continue ReadingGreenway Rail and Power – South London Substation
Lineside cable troughing is not always the easiest task to complete, with existing routes, vegetation and older infrastructure often getting in the way. Obstacles like these have to be factored into the design of a project and often lead to certain products being specified or requested. Rail contractors Greenway Rail and Power were contracted to deliver such a project at a substation in South London, where our Arcosystem was the perfect solution.
Continue ReadingPACE Infrastructure Solutions – Bespoke Cable Management
Working on projects in the rail industry often brings it challenges with congested infrastructure, old and new technologies meeting or ground conditions proving difficult. Projects often need special attention to get done right. When railway engineering contractors Haigh Rail Ltd asked us to work on one such project with them at Greenbank Station, Northwich we were only too happy to help.
Continue ReadingHaigh Rail Limited – Greenbank Station
Working on projects in the rail industry often brings it challenges with congested infrastructure, old and new technologies meeting or ground conditions proving difficult. Projects often need special attention to get done right. When railway engineering contractors Haigh Rail Ltd asked us to work on one such project with them at Greenbank Station, Northwich we were only too happy to help.
Continue ReadingInstalcom Limited – West Coast Mainline Telecom Network, Milton Keynes
Scott Parnell was delighted to support Instalcom Limited to complete a project installing a new telecom network on the West Coast Mainline, Milton Keynes.
Continue ReadingAM1 Projects
Working on projects in the rail industry involves careful planning and the highest level of specialist expertise. Projects often need to be carried out speedily and in short notice. When railway electrification specialists AM1 Projects asked us to work with engineers on an assignment on the Isle of Sheppey, Kent, we were only too happy to help.
Continue ReadingKier Utlities & Rail – Brighton mainline re-signalling
Scott Parnell was delighted to support Kier Utilities over the last 12 months on the completion of the Brighton mainline re-signalling scheme.
Continue ReadingAston Clinton, Aylesbury, Bucks HP22
We were approached by NC & JC Construction with a view to pricing a large attenuation tank (960m3) for a job in Aston Clinton, Aylesbury.
Continue ReadingColindale Gardens, Rowan Drive, London NW9
We were approached by our client Oliver Connell regarding the supply & installation of an attenuation tank on their site in Colindale. They needed help with the original layout of the tank which had been designed to go in between concrete pads. We looked at the design & noticed we could make the tank longer & thinner. This made the installation more straight forward & made the excavation a lot simpler for the customer.
Continue ReadingRiver Gardens, Greenwich, London SE10
We were asked by our client Groundsure Enabling & Remediation Services ltd to work with them on a project in Greenwich which involved the supply & installation of a 'Blue roof system' utilizing the Permavoid Geocellular system.
Continue ReadingRiverwalk School, Bury St Edmunds IP33
We were approached by our client Longreach Construction with a view to the supply & installation of a large soakaway for their project.
Continue ReadingMaidstone Road, Milton Keynes, Buckinghamshire MK10
We were approached by our client Smith Construction in regard to supplying & installing a fully welded attenuation tank. Part of the design scope was having future access to the attenuation system once it was installed. With this in mind we chose the Polystorm system from Polypipe.
Continue Reading